CNOOC Bozhong 19-2 Oilfield Electric Heat Tracing System

Project Overview

Bozhong 19-2 Oilfield has an average water depth of about 20 meters. It is a complete, high-quality medium-to-large oilfield discovered by CNOOC within the Bozhong 19-6 buried-hill oil and gas reservoir.

 

CNOOC Bozhong 19-2 Oilfield Electric Heat Tracing System

Project Name

Bozhong 19-2 Oilfield Development Project

 

Location

Tianjin

 

Facility Name

Five offshore platforms: Bozhong 19-2 WHPA, WHPB, WHPC, WHPD and CEPE

 

Pipe & Equipment Specifications

Pipelines and skid units

 

Process Systems

Crude oil / condensate processing system, subsea pipeline emergency displacement system, natural gas / associated gas processing system, diesel system, flare system, open drain system, chemical injection system, closed drain system, water injection system, utility / instrument air system, nitrogen system, seawater system, fresh water system, domestic sewage treatment system, heat medium system

 

Temperature Control Requirement

Freeze protection and process temperature maintenance

 

Product Models

Huanrui DBR, ZBR, XBR and MI series heating cables

 

Total Heating Cable Length

67,803 meters

 

Number of Circuits

898

 

Total Power

1884.79 KW