Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000
hohhot metro line 2 phase i electric heat tracing and insulation-0

Rail transit achievements

Home >  Case >  Rail transit achievements

Back

Hohhot Metro Line 2 Phase I Electric Heat Tracing and Insulation

图片8.png

Hohhot Metro Line 2 is the second subway line completed and opened to traffic in Hohhot, Inner Mongolia Autonomous Region, China. The first phase of the trial operation project was launched on October 1, 2020.

Project Name: Hohhot Metro Line 2 Phase I Electric Heat Tracing and Insulation

Address: Hohhot, Inner Mongolia

Collaboration time: September 8, 2018

Device Name: Line 2 Full Line

Pipe diameter/equipment parameters: DN20-DN50

Maintain temperature: 5 ℃

Medium: Water

Product model: TXLP/2R

Product quantity: 8000 meters

Engineering composition: design, supply

 

Prev

Electric Heat Tracing for Putian Rolling Stock Depot of Zhengzhou Rail Transit Line 8 Phase I Project

ALL

CRRC Group

Next
Recommended Products