Project Overview
On October 21, 2024, the central platform of the world's largest metamorphic rock buried-hill oilfield was ready for delivery. After nearly 14 months of construction, the CEPA (Central Processing Platform) module for Phase I of Bozhong 26-6 Oilfield Development Project entered the final delivery stage. The module is 86 meters long, 69 meters wide and 23 meters high, with a designed float-over weight of over 16,000 tons. It is a multi-functional integrated offshore oil and gas platform integrating production and living facilities.

Project Name
Bozhong 26-6 Oilfield Development Project (Phase I)
Location
Tianjin & Qingdao
Facility Name
Bozhong 26-6 CEPA Platform
Pipe & Equipment Specifications
Pipelines and skid units
Temperature Control Requirement
Freeze protection and process temperature maintenance
Process Systems
Crude oil / condensate processing system, subsea pipeline emergency displacement system, natural gas / associated gas processing system, diesel system, flare system, open drain system, chemical injection system, closed drain system, water injection system, utility / instrument air system, nitrogen system, seawater system, fresh water system, domestic sewage treatment system, heat medium system, TEG regeneration & MRU system
Product Models
Huanrui DBR, ZBR, XBR and MI series heating cables
Total Heating Cable Length
69,339 meters
Number of Circuits
943
Total Power
1901.07 KW