Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000
bozhong 19 2 oilfield development engineering project-0

Oil achievements

Home >  Case >  Oil achievements

Back

Bozhong 19-2 Oilfield Development Engineering Project

图片1.png

The average water depth of Bozhong 19-2 oilfield is about 20 meters, and it is a fully assembled, high-quality large and medium-sized oilfield discovered by CNOOC on the Bozhong 19-6 buried hill oil and gas reservoir.

Project Name: Bozhong 19-2 Oilfield Development Engineering Project     

Address: Tianjin

Device name: Bohai 19-2WHPA, WHPB, WHPC, WHPD, CEPE 5 offshore platforms

Pipe diameter/equipment parameters: pipeline, pry block  

Media: Crude oil/condensate treatment system, marine pipeline emergency replacement system, natural gas/associated gas treatment system, diesel system, flare system, open discharge system, chemical injection system, closed discharge system, water injection system, utility/instrument gas system, nitrogen system, seawater system, freshwater system, domestic sewage treatment system, thermal medium system

Maintain temperature: antifreeze, process temperature maintenance

Product models: DBR, ZBR, XBR, MI

Product quantity: 67803 meters

Number of circuits: 898

Total power: 1884.79

Engineering composition: design, supply

Prev

ozhong 26-6 Oilfield Development Project (Phase I)

ALL

None

Next
Recommended Products