On October 21, 2024, the world's largest metamorphic rock buried hill oilfield center platform is about to be delivered. The CEPA (Central Processing Platform) module of the Bozhong 26-6 oilfield development (Phase I) project, which took nearly 14 months to build, has entered the countdown for delivery. The module is 86 meters long, 69 meters wide, and 23 meters high, with a designed floating weight of over 16000 tons.It is a multifunctional comprehensive marine oil and gas platform that integrates production and daily life.
Project Name: Bozhong 26-6 Oilfield Development Project (Phase I)
Address: Tianjin&Qingdao
Device Name: Bozhong 26-6 CEPA Platform
Pipe diameter/equipment parameters: pipeline, pry block
Maintain temperature: antifreeze, process temperature maintenance
Media: Crude oil/condensate treatment system, subsea emergency replacement system, natural gas/associated gas treatment system, diesel system, flare system, open discharge system, chemical injection system, closed discharge system, water injection system, utility/instrument gas system, nitrogen system, seawater system, freshwater system, domestic sewage treatment system, thermal medium system, TEG regeneration/MRU system
Product models: DBR, ZBR, XBR, MI
Product quantity: 69339 meters
Number of circuits: 943
Total power: 1901.07
Engineering composition: design, supply