Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000
jinzhou 23 2 oilfield project-0

Oil achievements

Home >  Case >  Oil achievements

Back

Jinzhou 23-2 Oilfield Project

图片3.png

The CEPB drilling and production platform of Jinzhou 23-2 oilfield is the first central platform for offshore multi-layer heavy oil thermal recovery in China. The developed Jinzhou 23-2 oilfield belongs to the "thousand layer cake" type multi-layer sand body heavy oil reservoir. Heavy oil is firmly adsorbed in the formation pores like "solid gel", making it difficult to recover. Thermal recovery is achieved by injecting high-temperature steam and other forms to reduce its viscosity and make it easier to develop.The average depth of the sea area is about 10 meters.

Project Name: Jinzhou 23-2 Oilfield Project

Address: Qingdao

Device Name: Jinzhou 23-2 CEPA CEPB Platform

Pipe diameter/equipment parameters: pipeline, pry block

Maintain temperature: antifreeze, process temperature maintenance

Media: Crude oil/condensate treatment system, subsea emergency replacement system, natural gas/associated gas treatment system, diesel system, flare system, open discharge system, chemical injection system, closed discharge system, water injection system, utility/instrument gas system, nitrogen system, seawater system, freshwater system, domestic sewage treatment system, thermal medium system

Product models: DBR, ZBR, XBR, MI

Product quantity: 177703 meters

Number of circuits: 1399

Total power: 2518.5

Engineering composition: design, supply

 

Prev

None

ALL

ozhong 26-6 Oilfield Development Project (Phase I)

Next
Recommended Products