Project Overview
Kenli 10-2 Oilfield is a large lithologic oilfield with 100-million-ton reserves discovered in the Bohai Sea. Its proven geological reserves exceed 100 million tons. Located in the shallow formation of Laizhou Bay Sag, it is about 245 kilometers away from Tianjin, with an average water depth of 15.7 meters. Full commissioning is scheduled for 2025, which will help the Bohai Oilfield hit the annual output target of 40 million tons.
The CEPC module of Kenli 10-2 Oilfield weighs over 20,000 tons, making it the heaviest module in the Bohai Oilfield so far. It functions as the central processing platform for heavy oil thermal recovery and cold recovery. TMCP high-strength steel is adopted for the first time in this project.
Project Name
Development Project of CNOOC Kenli 10-2 Oilfield
Facility Name
CEPC Platform of Kenli 10-2 Oilfield Development Project
Pipe & Equipment Specifications
Pipelines and skid units
Temperature Control Requirement
Freeze protection and process temperature maintenance
Process Systems
Crude oil / condensate processing system, subsea pipeline emergency displacement system, natural gas / associated gas processing system, diesel system, flare system, open drain system, chemical injection system, closed drain system, water injection system, utility / instrument air system, nitrogen system, seawater system, fresh water system, domestic sewage treatment system, heat medium system
Product Models
Huanrui DBR, ZBR, XBR and MI series heating cables
Total Heating Cable Length
127,530 meters
Number of Circuits
1215
Total Power
2176.5 KW