Get a Free Quote

Our representative will contact you soon.
Your Name
Your Email
Your Phone
Company Name
Your Message
0/1000
electric heat tracing for high purity silicon project of yunnan tongwei high purity silicon co ltd-0

Chemical achievements

Home >  Cases >  Chemical achievements

Back

Electric Heat Tracing for High-Purity Silicon Project of Yunnan Tongwei High-Purity Silicon Co., Ltd.

Project Overview

Yunnan Tongwei High-purity Crystalline Silicon Co., Ltd. was founded on April 16, 2020. It is located in Changning Sub-park, Baoshan Industrial and Trade Park, Yunnan Province. As a high-tech enterprise under Tongwei Co., Ltd., it specializes in the R&D and production of high-purity crystalline silicon. On May 1, 2024, the Phase II 200,000 tons/year high-purity crystalline silicon project was put into operation. The annual production capacity rose to 650,000 tons, making it the world’s largest single-site production base for high-purity crystalline silicon.

Project Overview

Project Name

Hydropower Silicon Material High-purity Crystalline Silicon Green Energy Project

Location

Yunnan

Cooperation Date

August 04, 2021 – July 25, 2023

Facility Name

Waste Gas Treatment, Off-gas Recovery, Cold Hydrogenation Unit A/B/C, Off-gas Recovery, Trichlorosilane Synthesis

Total Pipeline Length / Equipment Quantity

142 sets

Pipe Diameter & Technical Parameters

Φ1400 mm ~ Φ3200 mm

Maintained Temperature

90℃, 160℃, 180℃, 200℃, 260℃

Medium

Silicon powder, Silane gas

Applied Products

Huanrui MI heating cables

Total Heating Cable Length

27,180 meters

Number of Circuits

344

Total Power

1482.06 KW

Prev

Anhui Huanrui Wins Wanhua Chemical Constant Wattage Electric Heat Tracing Project

ALL

None

Next
Recommended Products