Get a Free Quote

Our representative will contact you soon.
Your Name
Your Email
Your Phone
Company Name
Your Message
0/1000
pipeline heat tracing shandong yulong island refining  chemical integration project-0

Chemical achievements

Home >  Cases >  Chemical achievements

Back

Pipeline Heat Tracing, Shandong Yulong Island Refining & Chemical Integration Project

Project Overview

Shandong Yulong Petrochemical Co., Ltd. The Yulong Island Integrated Refining & Chemical Project is a core project in the 14th Five-Year Plan of Shandong Province, with a total investment of over RMB 100 billion. The project will be constructed in two phases. Phase I mainly includes a 20 million tons/year refining unit, alongside multiple chemical production facilities such as a 3 million tons/year ethylene unit and a 3 million tons/year mixed xylene unit. It aims to build an integrated “Refining & Petrochemical – New Materials” industrial chain, boost structural optimization, transformation and upgrading of Shandong’s chemical industry, realize the replacement of old growth drivers with new ones and accelerate high-quality development.

山东裕龙石化 拷贝.jpg

Project Name

Yulong Island Integrated Refining & Chemical Project (Phase I)

Location

Yulong Island, Shandong Province

Cooperation Date

March 13, 2024

Pipe Diameter & Technical Parameters

DN15–DN500

Maintained Temperature

5℃–15℃

Medium

Water

Applied Products

Huanrui LSR, SSR, RDC1, RDC3 heating cables

Total Heating Cable Length

200,000 meters

Prev

None

ALL

Electric Heat Tracing for CNPC Diesel Hydro-upgrading Unit and Tanks

Next
Recommended Products