Jingsan Road, Feidong Economic Development Zone, Hefei +86-17730041869 [email protected]

Putian Rolling Stock Depot is a supporting subway depot for Zhengzhou Metro Line 8 Phase I. It is located on a plot of land east of the Beijing Hong Kong Macau Expressway and south of the Zhengzhou Bian Logistics Corridor in Zhengzhou, covering an area of 29.4 hectares and a total construction area of 122000 square meters.
Project Name: Electric Heat Tracing for Putian Rolling Stock Depot of Zhengzhou Rail Transit Line 8 Phase I Project
Address: Zhengzhou, Henan
Collaboration time: March 18, 2024
Device name: Fire protection pipelines for joint maintenance workshop, application workshop and auxiliary span, wheel turning workshop, washing workshop, traction substation, shunting engineering workshop, etc
Pipe diameter/equipment parameters: DN25-DN100
Maintain temperature: 5℃
Medium: Water
Product model: TXLP/2
Product quantity: 16019 meters
Number of circuits: 110
Total power: 260KW
Engineering composition: design, supply