Pipeline and Tank Heat Tracing for Sinopec Tangshan LNG Project

Project Overview

SINOPEC Fourth Construction Co., Ltd. is a wholly-owned subsidiary of SINOPEC Engineering (Group) Co., Ltd. under China Petrochemical Corporation. As an engineering service provider covering the full industrial chain of energy and chemical sectors, it provides services including engineering consultation, engineering design, construction, EPC contracting, project management, construction supervision and vocational training.

Project Overview

Project Name

Tangshan LNG Terminal Project

Location

Tangshan, Hebei

Cooperation Date

April 15, 2022 – August 29, 2024

Facility Name

Berth, trestle, tank farm, pump house, fire water storage tanks

Total Pipeline Length / Equipment Quantity

Pipeline length: 9,593.8 meters; 3 sets of Φ22024 × 22700 storage tanks

Pipe Diameter & Technical Parameters

DN20~DN1000

Maintained Temperature

5℃–10℃

Medium

Process water, domestic water, fire water

Applied Products

Huanrui LSR, RDC1 heating cables

Total Heating Cable Length

39,356 meters

Number of Circuits

9

Total Power

20 KW